By providing your contact information to Travis Chatwin, your personal information will be processed in accordance with Travis Chatwin's Privacy Policy. By checking the box(es) below, you expressly consent to receive marketing or promotional real estate communication from Travis Chatwin in the manner selected by you. For SMS text messages, message frequency varies. Message and data rates may apply. Consent is not a condition of purchase of any goods or services. You may opt out of receiving further communications from Travis Chatwin at any time. To opt out of receiving SMS text messages, reply STOP to unsubscribe. SMS text messaging is subject to our Terms of Use.

Thank you for your message. I will be in touch with you shortly.

Explore My Properties
The Coastal Rail Trail's Last Gap Is Closing, but Your Commute Changes First

The Coastal Rail Trail's Last Gap Is Closing, but Your Commute Changes First

Walk the Coastal Rail Trail north from the mosaic arch at Via de la Valle and you will eventually run out of path. Not gradually. The trail simply ends at Ocean Street, dumping cyclists and dog walkers into traffic a few blocks short of the Encinitas line. It has ended there since the trail's first segment opened in Solana Beach in the early 2000s, which made this one of the first North County cities to build its share of what was supposed to become a 44-mile coastal route from Oceanside to San Diego.

Two decades later, the money to finish that missing stretch finally arrived. What most residents have not clocked yet is that the fix changes their drive before it changes their walk, and that even when it is done, "done" will not mean what everyone assumes.

What the January Money Actually Buys

In January 2026, Solana Beach accepted $300,000 in state funding secured by State Senator Catherine Blakespear, who represents Encinitas, to close out a $1.075 million project extending the trail on the east side of Coast Highway 101 from Ocean Street to the Encinitas border. That $300,000 was the last piece needed. The rest had already been lined up.

Put in context, it was a small slice of a much larger allocation. Blakespear secured roughly $7 million total for projects across her Senate district that budget cycle, including an expansion at the Oceanside Museum of Art and a separate trail project in Laguna Niguel. The Solana Beach piece was the one that finally unlocked a project the city had wanted to finish since before some of its current residents moved in.

The scope itself is modest on paper: extend the concrete path, add decomposed granite shoulders, plant irrigation and greenery to match the existing design, and refresh the crescent-shaped platform at the current north end. But modest scope does not mean a modest wait. That is where the real story starts.

The Lane You Give Up Before You Get the Path

Here is the part that did not make the January headlines. When the city brought its design back to council in late June 2026, it came with a tradeoff nobody had mentioned five months earlier: a lane reduction on Coast Highway 101 itself.

To avoid cutting through a conservation easement along the Harbaugh Seaside Trails, the trail has to stay inside the existing highway right of way. The only way to fit it there is to narrow the two northbound lanes to one, starting just north of Solana Vista Drive and continuing to the city's northern boundary near Circle Drive.

Today After the extension
Northbound lanes, Solana Vista Dr to Circle Dr 2 1
Trail's northern endpoint Ocean Street Circle Drive, at the Encinitas line
Crescent platform at old endpoint Paved deck Removed, replaced with vegetation

City Engineer Austin Frisby described it to council as "the most feasible approach identified to date, while remaining within the existing roadway limits of Highway 101." City Manager Alyssa Muto put it more plainly: "There's some clear design constraints with the right-of-way that we have to design around."

If you drive that stretch to get to Encinitas, this is the change you will notice first, likely before a single foot of new sidewalk appears.

The Timeline Already Slipped Once

The state's own announcement in January 2026 said construction would begin that fall and finish by March 2028. Read the city's June 30, 2026 update from the same council session and a different picture starts to form. As of late June, the design was still being finalized, and the city expected to take the project out to bid within roughly six months.

Six months from late June puts bid documents landing sometime around the end of the year, which makes an actual fall 2026 groundbreaking a tight fit. Nobody has walked back the March 2028 completion date. But the gap between what got announced in January and what got presented in June is the kind of detail that only shows up if you're tracking both meetings, not just the press release.

Finished Doesn't Mean Connected

Here is the piece that matters most if you use this trail to get anywhere near Cardiff. Even after Solana Beach finishes its stretch to Circle Drive, the path still will not connect through to Cardiff State Beach, because the other half of that connection belongs to Encinitas, and Encinitas has not agreed on how to build it.

Back in 2023, the two cities jointly planned a pedestrian crossing at Harbaugh with a refuge island splitting Highway 101, which would have required its own lane reduction. In 2025, the Encinitas City Council said it did not favor that kind of road diet and started looking at moving the crossing farther north into Encinitas instead. Encinitas already has a separate $350,000 Caltrans grant earmarked for that crossing, but the design itself is back under review.

Solana Beach isn't waiting on the outcome. As Muto put it, the city is finishing its own portion "irrespective of what happens to the north." Mayor Lesa Heebner has also asked that the two historic beaches sitting at the trail's current dead end be preserved rather than paved over, which is why the existing crescent deck is being swapped for vegetation instead of more concrete.

So the honest version of the 2028 finish line is this: Solana Beach's gap closes, the road narrows to make room for it, and the trail still ends at a city boundary rather than a beach, until Encinitas settles a design fight that has already stalled once.

What's Already Done While You Wait

Not everything on this corridor is stuck in permitting. Some of it is already finished, and it is worth noticing on your next walk.

Fletcher Cove Park's mosaic shower, the one most regulars rinse off at after a swim, went through a full restoration between February 6 and February 13, 2026. Crews stripped mineral deposits, cleaned and restained the tile, and sealed it to protect the color. It reopened the same week.

Along the existing trail, the city's maintenance crew also refilled and leveled sections of decomposed granite edging that had shifted from erosion, and a new sculpture went into the median as part of the 2025-2026 Temporary Public Arts Exhibit. That joins work already in place along the corridor, including the Amber Irwin-designed Sunburst sculpture and the mosaic gateway arches at the trail's southern entrance, all originally built into Schmidt Design Group's plan for the trail as a piece of public art, not just a bike path.

None of that solves the Circle Drive problem. But it is a reminder that the city treats this half mile the way it treats the rest of the corridor: as something worth maintaining in public, in the open, a little at a time.

What This Means for Your Fall

If you drive Coast Highway 101 through the northern end of town, expect the lane striping to change before the new pavement shows up, likely closer to winter than the fall date first announced. If you walk or bike the trail, expect Ocean Street to remain the practical end point for a while yet, and even after Circle Drive opens, know that Cardiff is still a separate negotiation away. If you just want your Sunday walk to look a little better, the mosaic shower and the fresh sculpture in the median are already there.

This is the kind of detail that never shows up on a listing sheet but shapes what it actually feels like to live two blocks from the trail versus two blocks from the highway. If you are trying to figure out how a specific address here fits into that picture, from which lane changes touch your street to which stretch will still feel unfinished in 2028, Beach and Sun Homes has been walking this stretch of North County long enough to know where the gaps actually are. Schedule a call with Travis when you're ready to talk through it.